Tokyo Electric Power Holdings Logo
JP3585800000
854307
9501.T

Tokyo Electric Power Holdings

Prévisions

Aucune donnée d'analyste n'est disponible pour cette entreprise.

Discussions dans la communauté

Il n'y a pas encore de discussion sur cet actif.

Lancer une discussion

  • Tepco brings reactor at Kashiwazaki-Kariwa back online and faces decommissioning problems in Fukushima

    Tepco was allowed for the first time to restart a reactor at the Kashiwazaki-Kariwa plant, while across Japan 15 of 33 still-operable reactors are back on the grid. At the same time, Tepco is struggling with delays in decommissioning Fukushima Daiichi; the complete recovery of the melted fuel has been pushed into the 2037s or later and decommissioning is planned through 2051. The restart comes against a backdrop of fading memory of the 2011 disaster and continued public concern about future earthquake risks. » Plus sur finanzen.net


  • Tepco halts restart of reactor 6 at Kashiwazaki-Kariwa nuclear plant due to malfunction

    Tepco stopped the restart of reactor 6 at the Kashiwazaki-Kariwa nuclear power plant a few hours after it began because of a fault in the control rods. According to the operator there is no safety risk; the reactor is being shut down for a more detailed inspection. A new start date has not yet been set, although reactor 6 could supply about 1.35 million kilowatts and thus power more than one million households. » Plus sur rnd.de


  • Tepco brings reactor 6 at Kashiwazaki-Kariwa nuclear power plant back online

    Tepco has restarted reactor No. 6 at the Kashiwazaki-Kariwa nuclear power plant after inspections, the first restart since the Fukushima disaster nearly 15 years ago. Commercial operations are expected to begin by the end of February and should improve power supply in the Greater Tokyo area. The restart is seen as a turning point for Japan’s energy policy and bolsters the role of nuclear power in supply security, while other reactors still await approvals or further inspections. » Plus sur n-tv.de


  • Tepco to restart first reactor at Kashiwazaki-Kariwa on January 20

    Tepco plans to bring unit 1 of the Kashiwazaki-Kariwa nuclear power plant back online on January 20, the first restart since the Fukushima nuclear disaster. Niigata’s regional assembly has approved a partial restart, and Tepco emphasizes that safety is the top priority. The move comes as Japan seeks to double the share of nuclear power in its energy mix and reduce reliance on fossil fuels. » Plus sur zeit.de


  • TEPCO clears final local hurdle to restart two reactors at Kashiwazaki-Kariwa

    The governor of Niigata formally endorsed restarting reactors No. 6 and No. 7 at the Kashiwazaki-Kariwa plant, clearing the last major local approval after the prefectural assembly backed funding. TEPCO will seek a final safety inspection from the Nuclear Safety Authority, with the No. 6 reactor possibly resuming operations in January while work on No. 7 will take several years. The move marks a key step in Japan's push to expand nuclear generation amid fuel concerns and aims to ease TEPCO's financial burden from Fukushima-related costs. » Plus sur abcnews.go.com

En 2010, Tokyo Electric Power Holdings a déjà versé 0,28 € de dividendes. Le dernier versement a eu lieu en novembre 2010.

Données financières

Au dernier trimestre, Tokyo Electric Power Holdings a réalisé un chiffre d'affaires de 10,03 Md € et un bénéfice net de 352,03 M €

(EUR) septembre 2026
YoY
Chiffre d'affaires 10,03 Md 0,98 %
Bénéfice brut 3,4 M 98,17 %
Bénéfice net 352,03 M 57,92 %
EBITDA 603,74 M 63,73 %

Données fondamentales

Indicateur Valeur
Capitalisation boursière
3,82 Md €
Nombre d'actions
1,6 Md
Plus haut/bas sur 52 semaines
4,77 € - 2,30 €
Dividendes Non
Bêta
-0,01
Ratio P/E
2,14
Ratio PEG
0,01
Ratio P/B
0,19
Ratio P/S
0,10

Profil de l'entreprise

Tokyo Electric Power Company Holdings, Incorporated produit, transporte, distribue et commercialise de l'électricité au Japon et à l'international. La société exploite un portefeuille de centrales thermiques, nucléaires, solaires, éoliennes, hydroélectriques et géothermiques. Elle est également active dans la vente de gaz ainsi que dans la fourniture de services de conseil aux entreprises du secteur de l'électricité. La société était auparavant connue sous le nom de Tokyo Electric Power Company, Incorporated et a changé sa dénomination en Tokyo Electric Power Company Holdings, Incorporated en avril 2016. La société a été fondée en 1951 et son siège social se situe à Tokyo, au Japon. Tokyo Electric Power Company Holdings, Incorporated est une filiale de Nuclear Damage Compensation and Decommissioning Facilitation Corporation.

Nom
Tokyo Electric Power Holdings
PDG
Tomoaki Kobayakawa
Siège social Tokyo, ty
Japon
Site web
Secteur
Services aux collectivités
Industrie
Services d'électricité
Introduction en bourse
26/05/2021
Employés 38 341

Symboles boursiers

Bourse Symbole
Japan Exchange Group
9501.T
Pnk
TKECF
Frankfurt
TPO.F
Düsseldorf
TPO.DU
München
TPO.MU
🍪

Parqet  utilise des cookies. En savoir plus