Capstone Copper Mining Logo
CA14071L1085
A3DH8D
CS.TO

Capstone Copper Mining

Kurser indlæses...

Prognose

Køb
  8
Behold
  0
Sælg
  0

  • Capstone Copper resumes Mantoverde operations, expects 50–75% output during strike

    Capstone Copper has restarted production at its Mantoverde mine in Chile after a suspension caused by lack of access to the desalination plant. The company says it will operate at about 50% to 75% of normal production while Union #2, representing roughly 22% of the workforce, continues a strike that began Jan 2. Capstone remains willing to negotiate with the union, will follow legal procedures and says it is committed to transparency and community standards. » Mere på financialpost.com


  • Capstone Copper Q2 2025: record production drives EBITDA up 75%

    Capstone Copper reported a record copper production of 57,416 tonnes in Q2 2025, revenue of $543.2 million and adjusted EBITDA of $215.6 million (+75% y/y). C1 cash costs fell to $2.45/lb thanks to operational improvements, with Mantoverde and Mantos Blancos as drivers. The company reaffirmed its full-year guidance of 220–255 kt and received approval for the MV‑O project; the final investment decision is expected in Q3. Capstone shows consolidated net debt of $692 million and available liquidity of $1,107 million, providing room for its growth plans. » Mere på de.investing.com


  • Capstone Copper reports strong Phase 1 drill results at Mantoverde with higher-than-expected grades and northern extensions

    Capstone Copper announced initial assays from its 30,000-metre Phase 1 drill program at Mantoverde, reporting higher-than-expected copper grades in the Brecha Flores sector and results consistent with the block model at Mantoverde Sur and Norte. Step-out drilling along the Santa Clara Corridor and into the Animas area confirmed continuity and northward extension of mineralization, supporting potential resource growth and reserve conversion. The company will advance a Phase 2 program starting in Q4 2025 (~31,500 metres planned across northern pit targets and a 10-km corridor) as part of a two-year, ~$25 million exploration plan. » Mere på financialpost.com

I 2022 har Capstone Copper Mining allerede udloddet 17,54 € i udbytte. Den seneste udlodning fandt sted i april 2022.

Virksomhedstal

I det seneste kvartal havde Capstone Copper Mining en omsætning på 648,09 mio. € og et nettoresultat på 65,07 mio. €
(EUR) juni 2026
YoY
Omsætning 648,09 mio. 40,64 %
Bruttofortjeneste 319,57 mio. 251,82 %
Nettoresultat 65,07 mio. 219,98 %
EBITDA 303,19 mio. 74,00 %

Fundamentale data

Nøgletal Værdi
Markedsværdi
6,62 mia. €
Antal aktier
763,79 mio.
Højeste/laveste i 52 uger
11,55 € - 5,89 €
Udbytte Nej
Beta
2,17
P/E (PE Ratio)
16,25
PEG (PEG Ratio)
0,03
K/I (PB Ratio)
2,13
P/S (PS Ratio)
2,86

Virksomhedsprofil

Capstone Copper Corp. ist ein Kupferbergbauunternehmen mit Schwerpunkt auf dem amerikanischen Kontinent. Das Unternehmen besitzt und betreibt die Kupfermine Pinto Valley in Arizona (USA), die Kupfer-Silber-Mine Cozamin in Zacatecas (Mexiko), die Kupfer-Silber-Mine Mantos Blancos in der Region Antofagasta (Chile) und 70 % der Kupfer-Gold-Mine Mantoverde in der Region Atacama (Chile). Das Unternehmen besitzt auch das vollständig genehmigte Kupfer-Gold-Projekt Santo Domingo nordöstlich von Mantoverde in der Region Atacama, Chile, sowie ein Portfolio von Explorationsgrundstücken in Nord- und Südamerika. Der Hauptsitz des Unternehmens befindet sich in Vancouver, Kanada.

Navn
Capstone Copper Mining
CEO
Cashel Aran Meagher
Hjemsted Vancouver, bc
Canada
Websted
Sektor
Materialer
Branche
Metaller og minedrift
Børsnotering
20.08.2015
Medarbejdere 3.008

Tickersymboler

Børs Symbol
Toronto Stock Exchange
CS.TO
Pnk
CSCCF
Düsseldorf
OUW0.DU
München
OUW0.MU
🍪

Parqet  bruger cookies. Læs mere