Loading quotes...
Forecast
The analysts' average price target is €3.47 (+247.00%). The median is €3.47 (+247.00%).
| Buy |
1 |
| Hold |
0 |
| Sell |
0 |
News Go to news feed
Soluna: AI expansion hits capacity limits in energy, labor and construction
Industry representatives said at the conference that demand for AI data centers is very high, but expansion projects are being slowed by bottlenecks in power connections, land, permits, qualified workers and equipment. Bitcoin miners like Soluna are using existing energy assets to expand into colocation and GPU-as-a-Service; Soluna cites a portfolio of more than 30 projects with a total of 6.3 GW in energy assets, of which 1.6 GW are in development. Large colocation contracts and project pipelines exist, but lenders are increasingly demanding executable, risk-reduced projects with experienced construction partners. Market participants stress that the issue is less demand and more the timely provision of power and infrastructure. » More on de.investing.com
ERCOT classifies Soluna project "Project Dorothy" (100 MW) as conditional baseload
ERCOT has conditionally classified Soluna’s 100‑MW campus Project Dorothy as baseload under "Batch Zero," bringing the combined baseload status at both Texas sites to 266 MW alongside the previously confirmed Kati position. Soluna also applied for an additional 50 MW distribution interconnection at the Dorothy site; that request is under review. The classification remains conditional until verification is complete and provisionally secures interconnection capacity without further reliability tests. Project Dorothy uses wind power from the Briscoe Wind Farm site; Soluna cites an operational capacity of around 206 MW and a development pipeline of about 6.3 GW. » More on de.investing.com
Soluna partners with Bitdeer for 28 MW Bitcoin mining at Kati‑1 site in Texas
Soluna has agreed a co‑mining partnership with Dory Creek (Bitdeer) to provide and install about 28 MW of mining equipment (approx. 1.93 EH/s) in the K1BC phase of the wind‑powered Kati‑1 data centre in South Texas. Commissioning is to be phased beginning in September 2026; Bitdeer will supply and own the Sealminer A2 Pro Air machines, Soluna will provide the site, power and turnkey operations, and revenues will be shared. Kati‑1 has an 83 MW capacity and recorded its first gross profit in Q2 2026; Soluna currently operates 192 MW and has a development pipeline of 6.3 GW. » More on de.investing.com
Historical dividends Dividends
All dividend metrics All metricsFinancials
| (EUR) | June 2026 | |
|---|---|---|
| Revenue | 13.2m | 152.57% |
| Gross profit | 671.18k | 33.41% |
| Net profit | -18.15m | 189.72% |
| EBITDA | -15.42m | 470.10% |
Fundamentals
| Metric | Value |
|---|---|
Market capitalization | €162.69m |
Number of shares | 157.75m |
52-week high/low | €4.45 - €0.51 |
| Dividends | No |
Beta | 5.09 |
P/E ratio | -0.66 |
PEG ratio | 0.00 |
P/B ratio | 1.00 |
P/S ratio | 4.46 |
Company profile
Soluna Holdings, Inc. baut und entwickelt modulare Datenzentren für das Mining von Kryptowährungen. Es ist auch im Blockchain-Geschäft tätig. Der Hauptsitz des Unternehmens befindet sich in Albany, New York.
| Name | Soluna Holdings |
| CEO | John Belizaire |
| Headquarters | Albany,
ny USA |
| Website | |
| Industry | Professional Services |
| IPO | 14/06/1999 |
| Employees | 52 |