A carregar cotações...
Previsão
O preço-alvo médio dos analistas é € 81,68 (+5,87%). A mediana é € 81,50 (+5,64%).
| Comprar |
24 |
| Manter |
11 |
| Vender |
1 |
Discussões na comunidade
- Ideensammlung für ETF-Neuling
u user_e5368e I em Schnack
0 13 - Scalable Capital DRIPs unzuverlässig
E Evergreen V em Schnack
1 17 - Suche nach Aktie oder ETF im Bereich Energiesektor
Marlon III em Schnack
0 44 - Versorgungsunternehmen im Bereich Energie
Burhan A. I em Schnack1 26 - Roast my Portfolio
E Ercan IV em Portfolio Roasts
6 30
Notícias Ir para o feed de notícias
NextEra Energy reports sharply higher quarterly profit and revenue
NextEra Energy reported earnings per share of $2.28 for the quarter ended September 30, 2026, compared with $1.18 in the year-ago quarter. Revenue rose to $8.38 billion from $7.24 billion a year earlier. The figures were released at the financial conference for the quarter end on October 21, 2026. » Mais em finanzen.net
NextEra Energy wins $1.9 billion DOE loan to restart Duane Arnold nuclear plant
NextEra Energy secured up to $1.9 billion in financing from the U.S. Department of Energy to support the restart of the Duane Arnold Energy Center, with operations targeted to resume in early 2029 pending Nuclear Regulatory Commission approval. The project already has a 25-year power purchase agreement with Google for the plant's 615 MW output, and the DOE loan reduces near-term funding pressure. The planned restart underpins NextEra's strategy to serve rising electricity demand from data centers and is complemented by the proposed merger with Dominion, but it remains exposed to regulatory, execution and AI-demand risks. » Mais em finance.yahoo.com
NextEra Energy targets large-load data center deals with 21 GW pipeline and rate-base capex
NextEra Energy's Florida Power & Light unit has about 21 GW of large-load interest, with 12 GW in advanced talks and at least one tariff-based large-load transaction expected by year-end. Each gigawatt of load is projected to represent roughly $2 billion of regulated capex that earns allowed returns, supporting EPS growth and a NEER backlog of ~35.1 GW; the Duane Arnold nuclear restart remains on track by Q1 2029. The regulated model shields returns from merchant power volatility but the pending Dominion combination and clean-energy policy create regulatory risks. » Mais em finance.yahoo.com
NextEra Energy secures financing for up to 10 GW of gas-fired power plants in Texas and Pennsylvania
NextEra Energy has reached agreements with the US Department of Commerce and the government of Japan that secure financing for the development and operation of up to 10 gigawatts of natural-gas-fired power capacity in Texas and Pennsylvania. The projects are part of Japan’s $550 billion investment pledge to the US; the first funding tranche of $3.3 billion is being released now and covers development tasks such as deposits for turbines and selection of EPC contractors. Construction is scheduled to begin, with initial capacity expected online by the end of 2028 and full completion planned for 2032; the projects remain subject to permitting and regulatory conditions and are expected to create numerous construction and permanent jobs. » Mais em de.investing.com
NextEra Energy faces AI-driven demand for 24/7 baseload power that challenges pure-renewables thesis
NextEra reported Q1 adjusted EPS of $1.09 and a roughly 33 GW renewables and storage backlog, with FPL seeing ~21 GW of large-load interest from hyperscalers. Big Tech’s need for uninterrupted, always-on power exposes the intermittency limits of wind and solar, prompting NextEra to restart the Duane Arnold nuclear plant and accept federal mandates to build gas capacity. The company’s heavy capex pace and premium valuation raise execution risk, forcing investors to reassess growth versus reliability trade-offs. » Mais em finance.yahoo.com
Dividendos históricos Dividendos
Todos os indicadores de dividendos Todos os indicadoresDados financeiros da empresa
| (EUR) | setembro de 2026 | YoY |
|---|---|---|
| Receitas | 7,14 bi | 5,22% |
| Ganho bruto | 2,32 bi | 48,47% |
| Ganho líquido | 4,22 bi | 102,92% |
| EBITDA | 4,2 bi | 4,10% |
Dados fundamentais
| Métrica | Valor |
|---|---|
Capitalização bolsista | € 163,33 bi |
Número de ações | 2,1 bi |
Máximo/mínimo de 52 semanas | € 88,44 - € 66,64 |
Rentabilidade de dividendos | 2,72% |
Dividendos TTM | € 2,10 |
Beta | 0,60 |
PER (PE Ratio) | 15,58 |
PEG (PEG Ratio) | 0,20 |
P/VC (PB Ratio) | 2,95 |
P/V (PS Ratio) | 6,26 |
Perfil da empresa
A NextEra Energy, Inc., através das suas subsidiárias, gera, transmite, distribui e vende energia elétrica a clientes retalhistas e grossistas na América do Norte. A empresa gera eletricidade através de instalações eólicas, solares, nucleares, a carvão e a gás natural. Desenvolve, constrói e opera também ativos com contratos de longo prazo que consistem em soluções de energia limpa, como instalações de produção renovável, projetos de armazenamento em baterias e instalações de transporte de eletricidade; vende mercadorias energéticas; e detém, desenvolve, constrói, gere e opera instalações de produção elétrica nos mercados grossistas de energia. Em 31 de dezembro de 2021, a empresa tinha aproximadamente 28.564 megawatts de capacidade líquida de produção; aproximadamente 77.000 milhas de circuito de linhas de transporte e distribuição; e 696 subestações. Serve aproximadamente 11 milhões de pessoas através de cerca de 5,7 milhões de contas de clientes na costa leste e na costa oeste inferior da Florida. A empresa era anteriormente conhecida como FPL Group, Inc. e mudou o seu nome para NextEra Energy, Inc. em 2010. A empresa foi fundada em 1925 e tem sede em Juno Beach, Florida.
| Nome | Nextera Energy |
| CEO | John W. Ketchum |
| Sede | Juno Beach,
fl EUA |
| Site | |
| Setor | Serviços públicos |
| Indústria | Serviços de eletricidade |
| Entrada em bolsa | 21/01/2011 |
| Colaboradores | 17.400 |
Análise aprofundada
Símbolos de ticker
| Bolsa | Símbolo |
|---|---|
NYSE | NEE |
London Stock Exchange | 0K80.L |
Frankfurt | FP3.F |
Düsseldorf | FP3.DU |
London | 0K80.L |
SIX | FP3.SW |
München | FP3.MU |
Wien | NEE.VI |
Milan | 1NEE.MI |