Valeura Energy Logo
CA9191444020
A1JKQ1
VLE.TO

Valeura Energy

A carregar cotações...

Previsão

Não temos dados de analistas para esta empresa.


  • Valeura accelerates redevelopment of the Wassana field in Thailand

    Valeura is accelerating the redevelopment of the Wassana oil field (Block G10/48) and is involved as the 100% operator. The new central processing platform is within budget and ahead of schedule; yard completion is expected on 1 October 2026 with installation in October 2026. The charter contract for the drilling platform Shelf Enterprise starts on 1 November 2026, and first oil production is targeted for early Q2 2027. By bringing the schedule forward, Valeura expects around 430,000 additional barrels of oil production in 2027 and has raised its adjusted 2026 capex forecast to USD 220–235 million (previously USD 195–215 million); the mobile unit Ingenium is planned to be decommissioned at the end of 2027. » Mais em de.investing.com


  • Valeura Energy unveils debt-free growth plan with strong cash position and M&A focus

    At EnerCom Denver, Valeura Energy presented a highly profitable business model: around 22,000 barrels per day from four offshore fields in Thailand, realized oil prices of USD 106/barrel in Q2 2025, USD 150 million cash flow and over USD 100 million free cash flow. The company reports 58 million barrels of proved reserves at the end of 2025, more than CAD 300 million in cash, no debt and total liquidity of CAD 640 million. Valeura plans organic growth through field development (especially Wassana) and inorganic expansion via three to four potentially transformative acquisitions in Southeast Asia, is also evaluating gas projects with PTTEP, and currently does not intend to pay dividends. » Mais em de.investing.com


  • Valeura completes eight wells in Thailand, production rises to around 10,500 bpd

    Valeura has successfully completed a drilling campaign at the Nong Yao field (Block G11/48): one exploration and seven horizontal development wells (90% operated interest), all brought into production as producing wells. The NYA-42ST1 well reached a horizontal length of 4,960 feet, setting a record in the Gulf of Thailand. The first multilaterally completed well of complex design (NYB-02ST1) opened two separate horizontal production legs. Production from Nong Yao rose to around 10,500 barrels per day in the most recent seven-day period (Valeura share before royalties). The mobile platform has been moved to the Jasmine field (Block B5/27, 100% Valeura), where a five-well program is planned, including a two-branch multilateral development well. » Mais em de.investing.com

Dados financeiros da empresa

No último trimestre, Valeura Energy registou receitas de € 225,02 mi e um ganho líquido de € 45,36 mi
(EUR) junho de 2026
YoY
Receitas 225,02 mi 105,18%
Ganho bruto 121,09 mi 485,85%
Ganho líquido 45,36 mi 881,12%
EBITDA 137,8 mi 150,26%

Dados fundamentais

Métrica Valor
Capitalização bolsista
€ 973,49 mi
Número de ações
106,16 mi
Máximo/mínimo de 52 semanas
€ 9,71 - € 3,78
Dividendos Não
Beta
-1,54
PER (PE Ratio)
16,67
PEG (PEG Ratio)
-0,24
P/VC (PB Ratio)
1,87
P/V (PS Ratio)
1,67

Perfil da empresa

Valeura Energy Inc. ist zusammen mit seinen Tochtergesellschaften in der Exploration, Entwicklung und Produktion von Erdöl und Erdgas in der Türkei tätig. Zum 31. Dezember 2021 war das Unternehmen an sechs Produktionspachtverträgen und Explorationslizenzen beteiligt, die ca. 0,23 Millionen Acres brutto und 0,19 Acres netto an tiefen Rechten im Thrakischen Becken im Nordwesten der Türkei umfassen. Valeura Energy Inc. wurde im Jahr 2000 gegründet und hat seinen Hauptsitz in Calgary, Kanada.

Nome
Valeura Energy
CEO
William Sean Guest
Sede Singapore, ab
Canadá
Site
Entrada em bolsa
25/10/2007
Colaboradores 189

Símbolos de ticker

Bolsa Símbolo
Toronto Stock Exchange
VLE.TO
Frankfurt
83PN.F
Düsseldorf
83PN.DU
München
83PN.MU
🍪

Parqet  utiliza cookies. Saber mais