Kurser indlæses...
Prognose
Analytikernes gennemsnitlige kursmål er 81,68 € (+5,87 %). Medianen er 81,50 € (+5,64 %).
| Køb |
24 |
| Behold |
11 |
| Sælg |
1 |
Diskussioner i communityet
- Ideensammlung für ETF-Neuling
u user_e5368e I i Schnack
0 13 - Scalable Capital DRIPs unzuverlässig
E Evergreen V i Schnack
1 17 - Suche nach Aktie oder ETF im Bereich Energiesektor
Marlon III i Schnack
0 44 - Versorgungsunternehmen im Bereich Energie
Burhan A. I i Schnack1 26 - Roast my Portfolio
E Ercan IV i Portfolio Roasts
6 30
Nyheder Til nyhedsfeedet
NextEra Energy reports sharply higher quarterly profit and revenue
NextEra Energy reported earnings per share of $2.28 for the quarter ended September 30, 2026, compared with $1.18 in the year-ago quarter. Revenue rose to $8.38 billion from $7.24 billion a year earlier. The figures were released at the financial conference for the quarter end on October 21, 2026. » Mere på finanzen.net
NextEra Energy wins $1.9 billion DOE loan to restart Duane Arnold nuclear plant
NextEra Energy secured up to $1.9 billion in financing from the U.S. Department of Energy to support the restart of the Duane Arnold Energy Center, with operations targeted to resume in early 2029 pending Nuclear Regulatory Commission approval. The project already has a 25-year power purchase agreement with Google for the plant's 615 MW output, and the DOE loan reduces near-term funding pressure. The planned restart underpins NextEra's strategy to serve rising electricity demand from data centers and is complemented by the proposed merger with Dominion, but it remains exposed to regulatory, execution and AI-demand risks. » Mere på finance.yahoo.com
NextEra Energy targets large-load data center deals with 21 GW pipeline and rate-base capex
NextEra Energy's Florida Power & Light unit has about 21 GW of large-load interest, with 12 GW in advanced talks and at least one tariff-based large-load transaction expected by year-end. Each gigawatt of load is projected to represent roughly $2 billion of regulated capex that earns allowed returns, supporting EPS growth and a NEER backlog of ~35.1 GW; the Duane Arnold nuclear restart remains on track by Q1 2029. The regulated model shields returns from merchant power volatility but the pending Dominion combination and clean-energy policy create regulatory risks. » Mere på finance.yahoo.com
NextEra Energy secures financing for up to 10 GW of gas-fired power plants in Texas and Pennsylvania
NextEra Energy has reached agreements with the US Department of Commerce and the government of Japan that secure financing for the development and operation of up to 10 gigawatts of natural-gas-fired power capacity in Texas and Pennsylvania. The projects are part of Japan’s $550 billion investment pledge to the US; the first funding tranche of $3.3 billion is being released now and covers development tasks such as deposits for turbines and selection of EPC contractors. Construction is scheduled to begin, with initial capacity expected online by the end of 2028 and full completion planned for 2032; the projects remain subject to permitting and regulatory conditions and are expected to create numerous construction and permanent jobs. » Mere på de.investing.com
NextEra Energy faces AI-driven demand for 24/7 baseload power that challenges pure-renewables thesis
NextEra reported Q1 adjusted EPS of $1.09 and a roughly 33 GW renewables and storage backlog, with FPL seeing ~21 GW of large-load interest from hyperscalers. Big Tech’s need for uninterrupted, always-on power exposes the intermittency limits of wind and solar, prompting NextEra to restart the Duane Arnold nuclear plant and accept federal mandates to build gas capacity. The company’s heavy capex pace and premium valuation raise execution risk, forcing investors to reassess growth versus reliability trade-offs. » Mere på finance.yahoo.com
Historisk udbytte Udbytte
Alle nøgletal for udbytte Alle nøgletalVirksomhedstal
| (EUR) | september 2026 | YoY |
|---|---|---|
| Omsætning | 7,14 mia. | 5,22 % |
| Bruttofortjeneste | 2,32 mia. | 48,47 % |
| Nettoresultat | 4,22 mia. | 102,92 % |
| EBITDA | 4,2 mia. | 4,10 % |
Fundamentale data
| Nøgletal | Værdi |
|---|---|
Markedsværdi | 163,33 mia. € |
Antal aktier | 2,1 mia. |
Højeste/laveste i 52 uger | 88,44 € - 66,64 € |
Udbytteafkast | 2,72 % |
Udbytte TTM | 2,10 € |
Beta | 0,60 |
P/E (PE Ratio) | 15,58 |
PEG (PEG Ratio) | 0,20 |
K/I (PB Ratio) | 2,95 |
P/S (PS Ratio) | 6,26 |
Virksomhedsprofil
NextEra Energy, Inc. genererer, transmitterer, distribuerer og sælger elektrisk strøm til detail- og engroskunder i Nordamerika via sine datterselskaber. Selskabet producerer elektricitet gennem vind-, sol-, kerne-, kul- og naturgasanlæg. Det udvikler, opfører og driver desuden langsigtede kontraktsikrede aktiver, der består af løsninger inden for grøn energi, såsom anlæg til vedvarende energiproduktion, batterilagringsprojekter og elektriske transmissionsanlæg; sælger energiråvarer; og ejer, udvikler, opfører, administrerer og driver elproduktionsanlæg på engrosenergimarkederne. Pr. 31. december 2021 havde selskabet cirka 28.564 megawatt nettoproduktionskapacitet, cirka 77.000 kredsmil transmissions- og distributionsledninger samt 696 transformerstationer. Det forsyner cirka 11 millioner mennesker via cirka 5,7 millioner kundekonti i den østlige og nedre vestlige kystregion af Florida. Selskabet var tidligere kendt som FPL Group, Inc. og skiftede navn til NextEra Energy, Inc. i 2010. Selskabet blev grundlagt i 1925 og har hovedsæde i Juno Beach, Florida.
| Navn | Nextera Energy |
| CEO | John W. Ketchum |
| Hjemsted | Juno Beach,
fl USA |
| Websted | |
| Sektor | Forsyning |
| Branche | Elforsyningsselskaber |
| Børsnotering | 21.01.2011 |
| Medarbejdere | 17.400 |
Tickersymboler
| Børs | Symbol |
|---|---|
NYSE | NEE |
London Stock Exchange | 0K80.L |
Frankfurt | FP3.F |
Düsseldorf | FP3.DU |
London | 0K80.L |
SIX | FP3.SW |
München | FP3.MU |
Wien | NEE.VI |
Milan | 1NEE.MI |