Tokyo Electric Power Holdings Logo
JP3585800000
854307
9501.T

Tokyo Electric Power Holdings

Prognose

Vi har ingen analytikerdata for denne virksomhed.

Diskussioner i communityet

Der er endnu ingen diskussion om dette aktiv.

Start diskussion

  • Tepco brings reactor at Kashiwazaki-Kariwa back online and faces decommissioning problems in Fukushima

    Tepco was allowed for the first time to restart a reactor at the Kashiwazaki-Kariwa plant, while across Japan 15 of 33 still-operable reactors are back on the grid. At the same time, Tepco is struggling with delays in decommissioning Fukushima Daiichi; the complete recovery of the melted fuel has been pushed into the 2037s or later and decommissioning is planned through 2051. The restart comes against a backdrop of fading memory of the 2011 disaster and continued public concern about future earthquake risks. » Mere på finanzen.net


  • Tepco halts restart of reactor 6 at Kashiwazaki-Kariwa nuclear plant due to malfunction

    Tepco stopped the restart of reactor 6 at the Kashiwazaki-Kariwa nuclear power plant a few hours after it began because of a fault in the control rods. According to the operator there is no safety risk; the reactor is being shut down for a more detailed inspection. A new start date has not yet been set, although reactor 6 could supply about 1.35 million kilowatts and thus power more than one million households. » Mere på rnd.de


  • Tepco brings reactor 6 at Kashiwazaki-Kariwa nuclear power plant back online

    Tepco has restarted reactor No. 6 at the Kashiwazaki-Kariwa nuclear power plant after inspections, the first restart since the Fukushima disaster nearly 15 years ago. Commercial operations are expected to begin by the end of February and should improve power supply in the Greater Tokyo area. The restart is seen as a turning point for Japan’s energy policy and bolsters the role of nuclear power in supply security, while other reactors still await approvals or further inspections. » Mere på n-tv.de


  • Tepco to restart first reactor at Kashiwazaki-Kariwa on January 20

    Tepco plans to bring unit 1 of the Kashiwazaki-Kariwa nuclear power plant back online on January 20, the first restart since the Fukushima nuclear disaster. Niigata’s regional assembly has approved a partial restart, and Tepco emphasizes that safety is the top priority. The move comes as Japan seeks to double the share of nuclear power in its energy mix and reduce reliance on fossil fuels. » Mere på zeit.de


  • TEPCO clears final local hurdle to restart two reactors at Kashiwazaki-Kariwa

    The governor of Niigata formally endorsed restarting reactors No. 6 and No. 7 at the Kashiwazaki-Kariwa plant, clearing the last major local approval after the prefectural assembly backed funding. TEPCO will seek a final safety inspection from the Nuclear Safety Authority, with the No. 6 reactor possibly resuming operations in January while work on No. 7 will take several years. The move marks a key step in Japan's push to expand nuclear generation amid fuel concerns and aims to ease TEPCO's financial burden from Fukushima-related costs. » Mere på abcnews.go.com

I 2010 har Tokyo Electric Power Holdings allerede udloddet 0,28 € i udbytte. Den seneste udlodning fandt sted i november 2010.

Virksomhedstal

I det seneste kvartal havde Tokyo Electric Power Holdings en omsætning på 10,03 mia. € og et nettoresultat på 352,03 mio. €

(EUR) september 2026
YoY
Omsætning 10,03 mia. 0,98 %
Bruttofortjeneste 3,4 mio. 98,17 %
Nettoresultat 352,03 mio. 57,92 %
EBITDA 603,74 mio. 63,73 %

Fundamentale data

Nøgletal Værdi
Markedsværdi
3,82 mia. €
Antal aktier
1,6 mia.
Højeste/laveste i 52 uger
4,77 € - 2,30 €
Udbytte Nej
Beta
-0,01
P/E (PE Ratio)
2,14
PEG (PEG Ratio)
0,01
K/I (PB Ratio)
0,19
P/S (PS Ratio)
0,10

Virksomhedsprofil

Tokyo Electric Power Company Holdings, Incorporated producerer, transmitterer, distribuerer og sælger elektrisk strøm i Japan og internationalt. Virksomheden driver en portefølje af termiske, nukleare, sol-, vind-, vand- og geotermiske kraftværker. Den er også involveret i gassalgsforretning samt levering af konsulentydelser til elselskaber. Virksomheden var tidligere kendt som Tokyo Electric Power Company, Incorporated og skiftede navn til Tokyo Electric Power Company Holdings, Incorporated i april 2016. Virksomheden blev grundlagt i 1951 og har hovedkontor i Tokyo, Japan. Tokyo Electric Power Company Holdings, Incorporated er et datterselskab af Nuclear Damage Compensation and Decommissioning Facilitation Corporation.

Navn
Tokyo Electric Power Holdings
CEO
Tomoaki Kobayakawa
Hjemsted Tokyo, ty
Japan
Websted
Sektor
Forsyning
Branche
Elforsyningsselskaber
Børsnotering
26.05.2021
Medarbejdere 38.341

Tickersymboler

Børs Symbol
Japan Exchange Group
9501.T
Pnk
TKECF
Frankfurt
TPO.F
Düsseldorf
TPO.DU
München
TPO.MU
🍪

Parqet  bruger cookies. Læs mere