Prognose
Vi har ingen analytikerdata for denne virksomhed.
Diskussioner i communityet
Der er endnu ingen diskussion om dette aktiv.
Start diskussionNyheder Til nyhedsfeedet
Tepco brings reactor at Kashiwazaki-Kariwa back online and faces decommissioning problems in Fukushima
Tepco was allowed for the first time to restart a reactor at the Kashiwazaki-Kariwa plant, while across Japan 15 of 33 still-operable reactors are back on the grid. At the same time, Tepco is struggling with delays in decommissioning Fukushima Daiichi; the complete recovery of the melted fuel has been pushed into the 2037s or later and decommissioning is planned through 2051. The restart comes against a backdrop of fading memory of the 2011 disaster and continued public concern about future earthquake risks. » Mere på finanzen.net
Tepco halts restart of reactor 6 at Kashiwazaki-Kariwa nuclear plant due to malfunction
Tepco stopped the restart of reactor 6 at the Kashiwazaki-Kariwa nuclear power plant a few hours after it began because of a fault in the control rods. According to the operator there is no safety risk; the reactor is being shut down for a more detailed inspection. A new start date has not yet been set, although reactor 6 could supply about 1.35 million kilowatts and thus power more than one million households. » Mere på rnd.de
Tepco brings reactor 6 at Kashiwazaki-Kariwa nuclear power plant back online
Tepco has restarted reactor No. 6 at the Kashiwazaki-Kariwa nuclear power plant after inspections, the first restart since the Fukushima disaster nearly 15 years ago. Commercial operations are expected to begin by the end of February and should improve power supply in the Greater Tokyo area. The restart is seen as a turning point for Japan’s energy policy and bolsters the role of nuclear power in supply security, while other reactors still await approvals or further inspections. » Mere på n-tv.de
Tepco to restart first reactor at Kashiwazaki-Kariwa on January 20
Tepco plans to bring unit 1 of the Kashiwazaki-Kariwa nuclear power plant back online on January 20, the first restart since the Fukushima nuclear disaster. Niigata’s regional assembly has approved a partial restart, and Tepco emphasizes that safety is the top priority. The move comes as Japan seeks to double the share of nuclear power in its energy mix and reduce reliance on fossil fuels. » Mere på zeit.de
TEPCO clears final local hurdle to restart two reactors at Kashiwazaki-Kariwa
The governor of Niigata formally endorsed restarting reactors No. 6 and No. 7 at the Kashiwazaki-Kariwa plant, clearing the last major local approval after the prefectural assembly backed funding. TEPCO will seek a final safety inspection from the Nuclear Safety Authority, with the No. 6 reactor possibly resuming operations in January while work on No. 7 will take several years. The move marks a key step in Japan's push to expand nuclear generation amid fuel concerns and aims to ease TEPCO's financial burden from Fukushima-related costs. » Mere på abcnews.go.com
Historisk udbytte Udbytte
Alle nøgletal for udbytte Alle nøgletalI 2010 har Tokyo Electric Power Holdings allerede udloddet 0,28 € i udbytte. Den seneste udlodning fandt sted i november 2010.
Virksomhedstal
I det seneste kvartal havde Tokyo Electric Power Holdings en omsætning på 10,03 mia. € og et nettoresultat på 352,03 mio. €
| (EUR) | september 2026 | YoY |
|---|---|---|
| Omsætning | 10,03 mia. | 0,98 % |
| Bruttofortjeneste | 3,4 mio. | 98,17 % |
| Nettoresultat | 352,03 mio. | 57,92 % |
| EBITDA | 603,74 mio. | 63,73 % |
Fundamentale data
| Nøgletal | Værdi |
|---|---|
Markedsværdi | 3,82 mia. € |
Antal aktier | 1,6 mia. |
Højeste/laveste i 52 uger | 4,77 € - 2,30 € |
| Udbytte | Nej |
Beta | -0,01 |
P/E (PE Ratio) | 2,14 |
PEG (PEG Ratio) | 0,01 |
K/I (PB Ratio) | 0,19 |
P/S (PS Ratio) | 0,10 |
Virksomhedsprofil
Tokyo Electric Power Company Holdings, Incorporated producerer, transmitterer, distribuerer og sælger elektrisk strøm i Japan og internationalt. Virksomheden driver en portefølje af termiske, nukleare, sol-, vind-, vand- og geotermiske kraftværker. Den er også involveret i gassalgsforretning samt levering af konsulentydelser til elselskaber. Virksomheden var tidligere kendt som Tokyo Electric Power Company, Incorporated og skiftede navn til Tokyo Electric Power Company Holdings, Incorporated i april 2016. Virksomheden blev grundlagt i 1951 og har hovedkontor i Tokyo, Japan. Tokyo Electric Power Company Holdings, Incorporated er et datterselskab af Nuclear Damage Compensation and Decommissioning Facilitation Corporation.
| Navn | Tokyo Electric Power Holdings |
| CEO | Tomoaki Kobayakawa |
| Hjemsted | Tokyo,
ty Japan |
| Websted | |
| Sektor | Forsyning |
| Branche | Elforsyningsselskaber |
| Børsnotering | 26.05.2021 |
| Medarbejdere | 38.341 |
Tickersymboler
| Børs | Symbol |
|---|---|
Japan Exchange Group | 9501.T |
Pnk | TKECF |
Frankfurt | TPO.F |
Düsseldorf | TPO.DU |
München | TPO.MU |