CEZ: reactor unit 2 at Temelin nuclear power plant shut down unexpectedly after control-system fault
At the Czech Temelin nuclear power plant, CEZ unexpectedly shut down and took reactor unit 2 offline because of a malfunction in the control system of a non-nuclear plant section. Technicians inspected the system and replaced an affected electronic board; further checks are under way and a restart is expected on Thursday. Reactor unit 1 continues to operate unaffected; unit 2 had only been brought back online in April after the annual outage. » Más en finanzen.net
CEZ raises 2026 outlook – half-year results show mixed picture
CEZ reported a 10% increase in adjusted net profit to CZK 18.1bn in the first half, while revenue (down 5% to CZK 74.75bn) and EBITDA (down 20% to CZK 59bn) suffered from lower power prices. Operating cash flow rose 55% to CZK 26bn and the company upgraded its 2026 forecasts for EBITDA (CZK 109–114bn) and adjusted net profit (CZK 31–35bn). CEZ is advancing the spin-off of ČEZ Energy; at the same time, rising net debt (about CZK 200bn), margin pressure in coal and volatile power prices weigh on the outlook. The share was unchanged at 498.4 and trades at the lower end of its 52-week range. » Más en de.investing.com
ČEZ Group Q1 2026: net profit rises, EBITDA falls and strategic restructuring announced
ČEZ Group reported a net profit increase of 13% to CZK 14.5 billion in Q1 2026, while EBITDA fell 18% to CZK 35.3 billion; revenue was CZK 85 billion and investments rose by 130%. The company proposes a dividend of CZK 42 per share and plans to spin off non-generation assets into a new company to attract ESG-focused investors. ČEZ also signed a memorandum of intent for SMR projects and emphasizes partnerships for new nuclear technologies. Headwinds include lower power prices, planned nuclear plant outages, and regulatory and execution risks; the stock is trading at a 52-week low. » Más en de.investing.com
CEZ: Dukovany reactors to be operated for up to 80 years
The Czech Republic plans, according to CEZ, to run the four WWER-440/213 reactor units in Dukovany for up to 80 years, which would mean operation until 2065–2067. CEZ CEO Daniel Benes describes the condition of the Soviet-era reactor units as "excellent" and views the lifetime extension as a complement, not a substitute, for new construction. At the same time, the construction of two new reactors in Dukovany has been awarded to the South Korean company KHNP. » Más en heise.de
Czech Republic plans to operate Dukovany nuclear plant for up to 80 years; CEZ says reactors in good condition
The Czech Republic intends to run its oldest nuclear power plant in Dukovany — four WWER-440/213 units from 1985–1987 — for up to 80 years instead of the planned 60, Industry and Trade Minister Karel Havlicek said. Daniel Benes, CEO of the partially state-owned utility CEZ, cited safety and economic analysis results and the good condition of the units as the basis for the lifetime extension. Continued operation is not meant to replace the planned new reactor projects; KHNP was awarded the contract for two new units at Dukovany. » Más en finanzen.net
Dividendos históricos Dividendos
Todas las métricas de dividendos Todas las métricasEn 2026, CEZ ya ha pagado 1,74 € en dividendos. El último pago fue en agosto.
Datos financieros
En el último trimestre, CEZ tuvo unos ingresos de 3194,11 M € y un beneficio neto de 352,79 M €
| (EUR) | septiembre de 2026 | YoY |
|---|---|---|
| Ingresos | 3194,11 M | 7,56 % |
| Beneficio bruto | 1578,4 M | 6,05 % |
| Beneficio neto | 352,79 M | 55,70 % |
| EBITDA | 1200,48 M | 3,64 % |
Datos fundamentales
| Métrica | Valor |
|---|---|
Capitalización bursátil | 29,2 mil M € |
Número de acciones | 536,81 M |
Máximo/mínimo de 52 semanas | 57,13 € - 44,38 € |
Rentabilidad por dividendo | 3,16 % |
Dividendos TTM | 1,74 € |
Beta | 0,08 |
Ratio P/E | 22,33 |
Ratio PEG | 1,92 |
Ratio P/B | 3,16 |
Ratio P/S | 2,28 |
Perfil de la empresa
CEZ, a. s., una empresa de generación de electricidad, se dedica a la producción, distribución, comercio y venta de electricidad y calor en Europa Occidental, Central y Sudoriental. La compañía opera a través de cuatro segmentos: Generación, Distribución, Ventas y Minería. Opera dos centrales nucleares, dieciséis centrales hidroeléctricas, una central de ciclo combinado de gas y ocho centrales de combustibles fósiles en la República Checa. La empresa también opera diversas centrales de combustibles fósiles, hidroeléctricas, eólicas, solares, de gas, biogás y biomasa en la República Checa; once parques eólicos en Alemania; y dos centrales de combustibles fósiles y dos centrales hidroeléctricas en Polonia. Además, participa en el comercio y venta de gas natural; la minería de carbón; la extracción y procesamiento de áridos y calizas para la construcción; las actividades de comercio de materias primas; y la prestación de servicios energéticos. Asimismo, la empresa posee una participación en el proyecto de minería de mineral de litio en Cínovec. CEZ, a. s. se constituyó en 1992 y tiene su sede en Praga, República Checa.
| Nombre | CEZ |
| CEO | Daniel Benes |
| Sede | Prague,
Chequia |
| Sitio web | |
| Sector | Servicios públicos |
| Industria | Productores independientes de energía y electricidad renovable |
| Salida a bolsa | 05/01/2000 |
| Empleados | 33.590 |
Deep Dive
Símbolos bursátiles
| Bolsa | Símbolo |
|---|---|
Wse | CEZ.WA |
Pra | CEZ.PR |
Pnk | CZAVF |
Frankfurt | CEZ.F |
Düsseldorf | CEZ.DU |
London | 0NZF.L |
München | CEZ.MU |
Warschau | CEZ.WA |