  • CEZ: reactor unit 2 at Temelin nuclear power plant shut down unexpectedly after control-system fault

    At the Czech Temelin nuclear power plant, CEZ unexpectedly shut down and took reactor unit 2 offline because of a malfunction in the control system of a non-nuclear plant section. Technicians inspected the system and replaced an affected electronic board; further checks are under way and a restart is expected on Thursday. Reactor unit 1 continues to operate unaffected; unit 2 had only been brought back online in April after the annual outage. » Plus sur finanzen.net


  • CEZ raises 2026 outlook – half-year results show mixed picture

    CEZ reported a 10% increase in adjusted net profit to CZK 18.1bn in the first half, while revenue (down 5% to CZK 74.75bn) and EBITDA (down 20% to CZK 59bn) suffered from lower power prices. Operating cash flow rose 55% to CZK 26bn and the company upgraded its 2026 forecasts for EBITDA (CZK 109–114bn) and adjusted net profit (CZK 31–35bn). CEZ is advancing the spin-off of ČEZ Energy; at the same time, rising net debt (about CZK 200bn), margin pressure in coal and volatile power prices weigh on the outlook. The share was unchanged at 498.4 and trades at the lower end of its 52-week range. » Plus sur de.investing.com


  • ČEZ Group Q1 2026: net profit rises, EBITDA falls and strategic restructuring announced

    ČEZ Group reported a net profit increase of 13% to CZK 14.5 billion in Q1 2026, while EBITDA fell 18% to CZK 35.3 billion; revenue was CZK 85 billion and investments rose by 130%. The company proposes a dividend of CZK 42 per share and plans to spin off non-generation assets into a new company to attract ESG-focused investors. ČEZ also signed a memorandum of intent for SMR projects and emphasizes partnerships for new nuclear technologies. Headwinds include lower power prices, planned nuclear plant outages, and regulatory and execution risks; the stock is trading at a 52-week low. » Plus sur de.investing.com


  • CEZ: Dukovany reactors to be operated for up to 80 years

    The Czech Republic plans, according to CEZ, to run the four WWER-440/213 reactor units in Dukovany for up to 80 years, which would mean operation until 2065–2067. CEZ CEO Daniel Benes describes the condition of the Soviet-era reactor units as "excellent" and views the lifetime extension as a complement, not a substitute, for new construction. At the same time, the construction of two new reactors in Dukovany has been awarded to the South Korean company KHNP. » Plus sur heise.de


  • Czech Republic plans to operate Dukovany nuclear plant for up to 80 years; CEZ says reactors in good condition

    The Czech Republic intends to run its oldest nuclear power plant in Dukovany — four WWER-440/213 units from 1985–1987 — for up to 80 years instead of the planned 60, Industry and Trade Minister Karel Havlicek said. Daniel Benes, CEO of the partially state-owned utility CEZ, cited safety and economic analysis results and the good condition of the units as the basis for the lifetime extension. Continued operation is not meant to replace the planned new reactor projects; KHNP was awarded the contract for two new units at Dukovany. » Plus sur finanzen.net

En 2026, CEZ a déjà versé 1,74 € de dividendes. Le dernier versement a eu lieu en août.

Données financières

Au dernier trimestre, CEZ a réalisé un chiffre d'affaires de 3,19 Md € et un bénéfice net de 352,79 M €

(EUR) septembre 2026
YoY
Chiffre d'affaires 3,19 Md 7,56 %
Bénéfice brut 1,58 Md 6,05 %
Bénéfice net 352,79 M 55,70 %
EBITDA 1,2 Md 3,64 %

Données fondamentales

Indicateur Valeur
Capitalisation boursière
29,2 Md €
Nombre d'actions
536,81 M
Plus haut/bas sur 52 semaines
57,13 € - 44,38 €
Rendement du dividende
3,16 %
Dividendes TTM
1,74 €
Bêta
0,08
Ratio P/E
22,33
Ratio PEG
1,92
Ratio P/B
3,16
Ratio P/S
2,28

Profil de l'entreprise

CEZ, a. s., une entreprise de production d'électricité, est active dans la production, la distribution, le commerce et la vente d'électricité et de chaleur en Europe de l'Ouest, en Europe centrale et en Europe du Sud-Est. La société opère à travers quatre segments : Production, Distribution, Ventes et Extraction minière. Elle exploite deux centrales nucléaires, seize centrales hydroélectriques, une centrale à cycle combiné gaz et huit centrales à combustibles fossiles en République tchèque. La société exploite également diverses centrales électriques à combustibles fossiles, hydroélectriques, éoliennes, solaires, au gaz, au biogaz et à la biomasse en République tchèque ; onze centrales éoliennes en Allemagne ; et deux centrales à combustibles fossiles et deux centrales hydroélectriques en Pologne. En outre, elle est impliquée dans le commerce et la vente de gaz naturel ; l'extraction du charbon ; l'exploitation de carrières et la transformation de granulats de construction et de calcaires ; les activités de négoce de matières premières ; et la fourniture de services énergétiques. Par ailleurs, la société détient une participation dans le projet d'exploitation de minerai de lithium à Cínovec. CEZ, a. s. a été constituée en 1992 et a son siège social à Prague, en République tchèque.

Nom
CEZ
PDG
Daniel Benes
Siège social Prague,
Tchéquie
Site web
Secteur
Services aux collectivités
Industrie
Producteurs indépendants d'électricité et d'énergie renouvelable
Introduction en bourse
05/01/2000
Employés 33 590

Symboles boursiers

Bourse Symbole
Wse
CEZ.WA
Pra
CEZ.PR
Pnk
CZAVF
Frankfurt
CEZ.F
Düsseldorf
CEZ.DU
London
0NZF.L
München
CEZ.MU
Warschau
CEZ.WA
🍪

Parqet  utilise des cookies. En savoir plus