Resolute Mining Logo
AU000000RSG6
794836
RSG.L

Resolute Mining

Prévisions

Aucune donnée d'analyste n'est disponible pour cette entreprise.

Discussions dans la communauté

Il n'y a pas encore de discussion sur cet actif.

Lancer une discussion

  • Resolute Mining presents growth plan with 500,000-ounce target but warns of operational bottlenecks

    At the Diggers & Dealers forum, Resolute Mining outlined plans for further growth and is targeting an annualized production rate of around 500,000 ounces, which could surpass its annual guidance. The company reports AUD 1.1 billion in cash and gold holdings, 7 million ounces of reserves and just under 14 million ounces of resources. Short-term risks remain: outstanding government approvals for the M5 underground development and limited access to explosives could pressure production and timelines. Key projects Kiaka, Sanbrado and M5 are expected to stabilise the production profile, with Kiaka potentially enabling significantly higher throughputs and longer-term upside. » Plus sur de.investing.com


  • Resolute Mining withdraws scoping study for ABC project in Côte d’Ivoire

    Resolute Mining has withdrawn a scoping study for the ABC project in Côte d’Ivoire that was published on 13 May 2026, after the ASX noted that the production targets and financial forecasts were based solely on inferred resources and therefore did not meet disclosure requirements under rule 5.16.6. The company applied for a voluntary trading halt to clarify disclosure requirements with the ASX and warned investors not to use the withdrawn announcement as the basis for investment decisions. The announcement was authorised by Chris Eger, Managing Director and CEO. » Plus sur de.investing.com


  • Resolute Mining: positive scoping study for ABC gold project in Côte d’Ivoire

    Resolute Mining publishes a positive scoping study for the ABC project based on a 2021 mineral resource estimate of 2.16 million ounces. The study envisages a 12‑year open‑pit operation with an average of 141,000 oz/year (LOM 1.7 million oz) at AISC of USD 1,614/oz and a processing capacity of 7.0 Mt/year. Initial capital expenditure is estimated at USD 648 million (±30%); at a gold price of USD 3,500/oz the after‑tax NPV is USD 1.2 billion (5% discount) with an IRR of 39% (payback 1.4 years). Resolute notes the production target is based on derived resources and that further exploration work and a definitive feasibility study are required by 2027; an updated resource estimate is expected in H2 2026. » Plus sur de.investing.com


  • Resolute Mining increases net cash significantly and starts construction phase at Doropo

    Resolute Mining reports strong cash generation in Q1 2026 with net cash of $315.4 million and total liquidity above $425 million, supported by operating receipts of $337.6 million and EBITDA of $202.9 million. Production was 59,603 ounces at an average realized gold price of $4,858/oz; AISC were $2,210/oz. The Doropo project in Côte d’Ivoire reached FID, received a 14‑year license and has begun land‑clearing; construction is due to start in Q2 2026, with first gold expected in H2 2028. Resolute maintains its full‑year guidance but warns of cost increases from higher fuel prices and increased royalties, and is reviewing financing options for planned 2026 capex of $310–360 million. » Plus sur de.investing.com


  • Resolute Mining increases cash flow, net cash and revenues in Q1 2026

    Resolute Mining reported Q1 2026 revenue of USD 338 million and production of 60,000 ounces of gold. Operating cash flow rose to USD 120 million (up USD 34 million versus the prior quarter) and net cash grew to USD 315 million. AISC were USD 2,210/oz; the Doropo project in Côte d’Ivoire is progressing through approvals and construction, with production targeted for 2028. Management emphasizes a focus on operational efficiency, strong liquidity and organic growth, but cites risks such as fuel costs, geopolitical uncertainties and gold price volatility. » Plus sur de.investing.com

En 2018, Resolute Mining a déjà versé 0,011 € de dividendes. Le dernier versement a eu lieu en octobre 2018.

Données financières

Au dernier trimestre, Resolute Mining a réalisé un chiffre d'affaires de 504,48 M € et un bénéfice net de 110,61 M €

(EUR) juin 2026
YoY
Chiffre d'affaires 504,48 M -
Bénéfice brut 246,59 M -
Bénéfice net 110,61 M -
EBITDA 270,83 M -

Données fondamentales

Indicateur Valeur
Capitalisation boursière
1,54 Md €
Nombre d'actions
2,14 Md
Plus haut/bas sur 52 semaines
1,11 € - 0,54 €
Dividendes Non
Bêta
1,33
Ratio P/E
8,00
Ratio PEG
0,00
Ratio P/B
1,72
Ratio P/S
1,43

Profil de l'entreprise

Resolute Mining Limited exerce des activités de minage, d'exploration, de développement, d'exploitation et de production de propriétés aurifères en Afrique, au Royaume-Uni et en Australie. Le projet phare de la société est la mine d'or de Syama, située au Mali, en Afrique de l'Ouest. Elle détient également la mine d'or de Mako au Sénégal, en Afrique de l'Ouest. La société est en outre impliquée dans la prospection et l'exploration de minéraux. Resolute Mining Limited a été constituée en 2001 et a son siège à Perth, en Australie.

Nom
Resolute Mining
PDG
Christopher Eger
Siège social Perth, wa
États-Unis
Site web
Secteur
Matériaux
Industrie
Métaux et exploitation minière
Introduction en bourse
08/10/2015
Employés 4 059

Symboles boursiers

Bourse Symbole
London Stock Exchange
RSG.L
Australian Securities Exchange Ltd
RSG.AX
Pnk
RMGGF
Frankfurt
RSM.F
Düsseldorf
RSM.DU
Hamburg
RSM.HM
London
RSG.L
SIX
RSM.SW
🍪

Parqet  utilise des cookies. En savoir plus